?

色婷婷超碰在线电影|亚洲无码99无码视频第1页|日本三级电影嫩逼女老师色情网|日本A片在线播放|日韩黄色电影AAAAA级|无码三级片在线播放强奸|美欧AV黄色黄色片2n|日韩人妻无码片视频|国产日韩午夜毛片一级精品|无码av第一页

LOCATION : HOME > News > Industry News

What are the requirements for installation of gas-fired atmospheric hot water boilers?

user:admin time:2018-07-24 view:1834

The common use of gas-fired hot water boilers is to provide living heating. If there is a requirement to install gas-fired atmospheric hot water boilers in the building during heating in winter, what are the requirements for heating in the building? What are the requirements for the hot water boiler room?

Construction requirements for the use of boilers in gas-fired atmospheric hot water boilers in buildings:

1. The gas boiler room in the building should be arranged according to the boiler model, number of units and auxiliary machine configuration, and then the floor plan should be designed. After the feasibility certification, it can be arranged.

2. The gas boiler room in the building should also comply with the relevant provisions of the Code for Fire Protection of Building Design and the Design Code for Boiler House GB50041-92.

3. When installing the gas-fired hot water boiler, pay attention to the following points: After making the feasibility plan for the boiler room layout, we will determine the boiler type and ensure the pipeline and the flue and equipment according to the external parameters of the boiler used. Easy installation and maintenance, as well as boiler maintenance space, such as the removal space of the front and rear doors, the maintenance space of the burner, after the Zui must comply with national safety regulations, such as pipeline selection.